Sets the date pointed to by @value corresponding to the date of the
given field. Caller is responsible for making sure the field exists
and has the correct type.
On success @value will point to a newly-allocated copy of the date which
should be freed with g_date_free() when no longer needed (note: this is
inconsistent with e.g. gst_structure_get_string() which doesn't return a
copy of the string).
Return: %TRUE if the value could be set correctly. If there was no field
with @fieldname or the existing field did not contain a data, this function
returns %FALSE.
Sets the date pointed to by @value corresponding to the date of the given field. Caller is responsible for making sure the field exists and has the correct type.
On success @value will point to a newly-allocated copy of the date which should be freed with g_date_free() when no longer needed (note: this is inconsistent with e.g. gst_structure_get_string() which doesn't return a copy of the string).